Start with conditions, not a product
Supply-valve condition, drain alignment, and rough-in compatibility all belong in the conversation before a fixture is installed.
Build a complete scope
- Existing conditions and likely cause
- Preparation and protection
- Materials, compatibility, and installation details
- Permits, testing, cleanup, and restoration
- Exclusions, warranty terms, and change-order process
Sterling Heights context
Fixtures original to Sterling Heights' 1950s-70s construction wave often use rough-in spacing and shutoff hardware that differs from current fixtures, which can add supply-line adjustment work to what looks like a simple swap.